American MadeU.S. HQ · Denver, Colorado

Inertial confinement · U.S. builder

Xcimer Energy

A gas laser, rebuilt in America. Phoenix is running. Athena is the plant. Their machines. Public sources.

Independent public atlas. Not a Xcimer site. 3D is an illustrative inertial confinement diagram — not their CAD. Product names are trademarks of their owners.

Drag to orbit. The bottle turns on its own. Generic inertial confinement diagram. Plasma is pink — hydrogen Balmer-alpha.

Driver
Laser

KrF excimer + SBS compression.

Prototype
Phoenix

>1 kJ pulses, 38 m gas optic.

Beamlines
Two

Versus NIF’s 192.

Plant
Athena

Mid-2030s target.

Readiness

Where the hardware is.

One meter, every builder. Stage is what public sources show today. The pink node is the company’s own plant date.

Design-only → Prototype → Assembling → Operating experimentPink dashed = company plant targetTargets, not guarantees

Xcimer

Phoenix → Athena

Now · Prototype
  1. Design-only
  2. Prototype
  3. Assembling
  4. Operating experiment
  5. Company plant targetAthena · mid-2030s

Phoenix started operations 3 Jun 2026 in Xcimer’s Denver laser facility — end-to-end excimer amplification and SBS pulse compression. Xcimer, 3 Jun 2026

Roadmap: Anvil (2028, 200 kJ), Vulcan (early 2030s, wall-plug breakeven target), Athena plant (mid-2030s). Targets, not guarantees. Xcimer, 3 Jun 2026

The machines

Named, dated, sourced.

Operating

Phoenix

Prototype krypton-fluoride laser system; the largest privately owned laser in the world, per Xcimer. Xcimer, 3 Jun 2026

Next

Anvil · Vulcan

Anvil: 200 kJ amplifier, 2028. Vulcan: 4–12 MJ system, early 2030s. Xcimer, 3 Jun 2026

Origin

The people on the paper.

CEO

Conner Galloway

Co-founder and chief executive.

President

Alexander Valys

Co-founder.

Thesis

Simpler laser

“NIF proved laser fusion physics works.” The plant needs a cheaper, simpler laser.

Capital

Public rounds, dated.

Company lifetime totals beat summing old rounds. Xcimer, 6 Oct 2026

2024-06
Series A $100M — Hedosophia led, in contemporaneous coverage.
2026-10-06
About $200M private and an additional DOE Milestone award of up to $30.5M.

Sources

Last verified 27 Nov 2026.

Independent public atlas. Not a Xcimer site. No company logo. 3D is illustrative — not their CAD. Figures are public targets and reporting, not guarantees.