American MadeU.S. HQ · Everett, Washington

Field-reversed configuration · U.S. builder

Helion Energy

Polaris is running. Orion is the plant being built for Microsoft. Their machines. Public sources.

Independent public atlas. Not a Helion site. 3D is an illustrative field-reversed configuration diagram — not their CAD. Product names are trademarks of their owners.

Drag to orbit. The bottle turns on its own. Generic field-reversed configuration diagram. Plasma is pink — hydrogen Balmer-alpha.

Role
Prototype

Polaris: seventh-generation machine.

Fuel
D–³He

D–T run in testing; D–³He for commercial.

Output
Direct e⁻

Inductive recovery, not steam.

Offtake
Microsoft

50 MW · 2028 target.

Readiness

Where the hardware is.

One meter, every builder. Stage is what public sources show today. The pink node is the company’s own plant date.

Design-only → Prototype → Assembling → Operating experimentPink dashed = company plant targetTargets, not guarantees

Helion

Polaris → Orion

Now · Operating experiment
  1. Design-only
  2. Prototype
  3. Assembling
  4. Operating experiment
  5. Company plant targetOrion · 2028

Polaris began operating at the end of 2024; in Feb 2026 Helion reported measurable D–T fusion and 150 million °C plasma. Helion, 13 Feb 2026

Orion, in Malaga, Washington, is under construction: assembly and office buildings done, generator-building earthwork began spring 2026. Initial operations targeted for 2028. Targets, not guarantees. Helion, 16 Jun 2026 Helion · Orion

The machines

Named, dated, sourced.

Operating

Polaris

Pulsed FRC prototype in Everett. First private machine to use deuterium–tritium fuel, per the company. Helion, 13 Feb 2026

Offtake

Microsoft · Nucor

Microsoft: at least 50 MW, initial operations 2028. Nucor: 500 MWe plant collaboration announced Sep 2023. Helion · Orion Helion, Sep 2023

Origin

The people on the paper.

CEO

David Kirtley

Co-founder and chief executive.

Co-founders

Slough · Pihl · Votroubek

John Slough, Chris Pihl, and George Votroubek, founding set of 2013.

The pitch

No turbine

Recover electricity directly from a changing magnetic field.

Capital

Public rounds, dated.

Company lifetime totals beat summing old rounds. TechCrunch, 28 Jan 2025 TechCrunch, 4 Jun 2026

2025-01-28
Series F $425M.
2026-06-04
Series G $465M — Helion said cumulative capital reached $1.5B.

Sources

Last verified 27 Nov 2026.

Independent public atlas. Not a Helion site. No company logo. 3D is illustrative — not their CAD. Figures are public targets and reporting, not guarantees.