Not a power plant. The proof — Kitty Hawk, not the airline.
SPARC is the proof. ARC is the plant. Their machines. Public sources.
Independent public atlas. Not a CFS site. Stills and 3D are illustrative — not CFS photographs or CAD. SPARC and ARC are trademarks of Commonwealth Fusion Systems.
The product
Eighteen D-shaped toroidal-field magnets. A vacuum vessel. A central solenoid. Pink plasma — hydrogen Balmer-alpha. Drag to orbit. Cut the shell away. Explode the coils. This is an illustrative reconstruction from public tokamak architecture, not an engineering export.
Click a tab or a part. The card to the left of SPARC is the explainer.
Not a power plant. The proof — Kitty Hawk, not the airline.
On-axis. Prototype magnet 20 T with MIT, 2021.
Designed thermal output. Fuel: deuterium–tritium.
117 Hospital Rd, Fort Devens, Massachusetts.
Three ways in
CFS is the U.S. private tokamak assembling a net-energy machine in Devens. Lifetime capital $4 billion as of the company’s 30 July 2026 announcement — about 30% of fusion-industry capital in CFS’s telling. SPARC is the de-risk. ARC in Virginia is the plant: ~400 MW in company materials, Google ~200 MW offtake, Eni offtake, early 2030s target. Dates are company targets, not guarantees.
Lifetime total $4B · CFS, 30 Jul 2026. Do not add the bars on top of $4B.
Fusion is the sun’s engine in a bottle. If confinement fails, the reaction stops. There is no chain reaction. SPARC sits on 60 acres at 117 Hospital Rd, Fort Devens — a science and engineering machine, not a power station. The follow-on plant, ARC, is the Fall Line Fusion Power Station in Chesterfield County, Virginia, aimed at the PJM grid in the early 2030s in company materials. Google has contracted for about half the first plant (~200 MW). This page is the neighbor brief: the picture, the safety fact, the paper trail.
You are not building “fusion.” You are stacking 18 D-shaped HTS toroidal-field magnets around a vacuum vessel, with a central solenoid down the hole of the doughnut. Hit TF coils, vessel, solenoid above — those links are what you send a new hire. 2021 with MIT: 20 T HTS magnet (the compact-tokamak bet). SPARC’s job: commercially relevant net energy (Q>1) with margin, targeting 2027. Mumgaard, August 2026: about 80% complete. ARC is the same idea sized for a molten-salt blanket and ~400 MW to the wire. This is the all-hands URL.
Origin
Commonwealth Fusion Systems came out of the MIT Plasma Science and Fusion Center. The bet: high-temperature superconducting magnets shrink a tokamak until a private company can build it.
CEO
Co-founder and chief executive. Public face of SPARC and the raises.
Co-founders
Dan Brunner, Brandon Sorbom, and Zach Hartwig — named with Mumgaard as the 2018 founding set in public profiles.
Lineage
2020 Journal of Plasma Physics papers on SPARC net-energy design, cited in CFS’s own Series B release.
Capital
Lifetime total is the company’s number: $4 billion as of 30 July 2026. Early rounds are listed because they name the first checks. Do not add them on top of $4B.
Phases
With MIT, CFS demonstrated a high-temperature superconducting magnet it called the strongest of its kind — the technology that lets SPARC be compact.
Eighteen TF magnets. Q>1 with margin, targeting 2027. Mumgaard: about 80% complete as of August 2026 reporting. First plasma / operations language in 2026 coverage sits in late 2026–2027. Company targets, not guarantees.
Fall Line Fusion Power Station, Chesterfield County. Molten-salt blanket, ~400 MW to the wire in company materials, early 2030s, Google ~200 MW, Eni offtake, PJM.
Follow-on plant
Same HTS tokamak idea, sized for the grid. Neutrons heat a blanket, breed tritium, make steam. That is the product a utility buys. SPARC is how you earn the right to build it.
The bet
HTS tape lets the field climb and the machine shrink. Fusion power in a tokamak scales steeply with magnetic field. That is why a magnet factory on the Devens campus is not a side shop — it is the product line.
Sources
Independent public atlas. Not a CFS site. No CFS logo. Stills and 3D are illustrative — not CFS photographs or CAD. Figures are public targets and reporting, not guarantees.